VISION
BPA will be a shining exhibit of the professional capability and competence of Ghanaian human resources and institutions.
MISSION
Develop, deploy and sustainably utilise the resources of the Black Volta to derive the optimum national benefits primarily by providing electricity at base price to spur industrial and agricultural production and impact the lives of millions.
BPA was established by the Act of Parliament, BPA Act 740, 2007 [4] with a mandate to plan, execute and manage the Bui Hydroelectric Project which includes:
Construction of dam and power house, installation of a 400MW generating plant and other infrastructure forming an integral part of the project.
Generation of electrical power for general industrial and domestic use.
Construction of a transmission system linked to the national grid.
Supply of electrical power to certified and licensed utility companies.
Promotion of activities consistent with the provision of facilities for multipurpose uses such as agro businesses, fisheries and tourism.
RE&EE Category Taxonomy:
Links
[1] mailto:info@buipowerauthority.com
[2] http://178.238.224.21/taxonomy/term/225
[3] http://www.buipowerauthority.com/index.htm
[4] http://www.buipowerauthority.com/Bui%20Power%20Authority%20Act.rar
[5] http://178.238.224.21/taxonomy/term/298
[6] http://178.238.224.21/taxonomy/term/217
[7] http://178.238.224.21/sites/default/files/documents/stakeholders/2011_bui-hydroelectric-project-leaflet_bui-power-authority.pdf